ACCELEROMETER,MECHA
This is a multi-item procurement for the manufacture of specific parts, including a Power Supply, Accelerometer, Electrical Connection Ring, and Inertial Measuring unit, requiring compliance with detailed military specifications and quality standards. The contractor is responsible for inspection and must maintain records for 365 days after final delivery. Award will be based on Lowest Price Technically Acceptable (LPTA) criteria, and consideration is limited to authorized distributors of the original manufacturer who must provide proof of authorization. The performance location is not specified, and no budget or specific non-bid timelines are provided in the description.