CIRCUIT CARD ASSEMB
This is a requirement for the manufacture of a CIRCUIT CARD ASSEMBLY, where contractors must be authorized distributors of the original manufacturer and provide proof of authorization with their offer. The performance location is restricted to the facility named in the contract, and any request to change the production facility requires a written request and must include a price reduction of $250.00 to cover administrative costs. Inspection of the material and final acceptance will occur at specific contractor facilities, with the exact Cage Code and address to be provided. All resulting orders will require electronic invoicing through the PIEE-WAWF system.