CONTROL UNIT
This is a government procurement for the manufacture of a CONTROL UNIT, with specific requirements tied to the manufacturer's design as represented by listed Cage Codes and reference numbers. The performance location is not specified, but any change to the production facility named in the contract requires advance written approval from the Contracting Officer and must include a price reduction of $250.00 to cover administrative costs. Inspection of the material and final acceptance locations are to be filled in by the offeror. The contract mandates specific marking standards, prohibits unauthorized substitutions, and requires the contractor to maintain all inspection records for 365 days after final delivery. Offerors must provide proof if they are an authorized distributor of the original manufacturer's item.