STRONGBACK,MK1MOD1
This is a manufacturing contract for the STRONGBACK, MK1 MOD1, with performance location and inspection details to be specified by the contractor. The award will be made using Lowest Price Technically Acceptable (LPTA) criteria. Contractors must provide proof of being an authorized distributor of the original manufacturer's item to be considered for award. The performance of work is prohibited at any location other than that named in the contract without specific written approval from the Contracting Officer, and such approval requests require a supporting price reduction of $250.00. No specific budget or timeline information is provided in the description.