CONTROL,I/O PLATE
SPRMM126QHA97
This is a manufacturing contract for a CONTROL, I/O PLATE, requiring the item to be produced according to a specific design from a designated Cage Code. The contractor is responsible for all inspection and quality assurance, maintaining records for 365 days after final delivery. Performance location is not specified. The contract involves standard government clauses for inspection, packaging, and electronic invoicing, and requires offerors to be authorized distributors of the original manufacturer's item.