INT CONTROL ASSY
The requirement is for manufacture and contract quality requirements for an INT CONTROL ASSY conforming to CAGE 0KPC5 reference CCHA161-2. Each unit must be 100% inspected and tested for visual, dimensional, mechanical, and electrical performance per CAGE 14304 drawing 10089-0230, with inspection and acceptance at source under DLA Procurement Note E06. Offerors must be OEM-authorized distributors or identify the OEM CAGE and part number, provide required distributor/dealer traceability, and may not offer refurbished material. Marking must meet MIL-STD-130, packaging MIL-STD 2073, and soldering IPC J-STD-001 Class 2 unless an ISEA waiver is approved; electronic invoicing and receiving reports must go through PIEE-WAWF. Inspection records must be retained for 365 calendar days after final delivery.