FAN ASSEMBLY TUBEAX
This is a contract for the manufacture of a FAN ASSEMBLY TUBEAX, requiring compliance with specific military standards and quality assurance procedures. The performance location is not specified, but any change to the production facility requires written approval from the Contracting Officer and must include a $250 price reduction to cover administrative costs. Inspection and acceptance locations are to be determined and filled in. Vendors must be authorized distributors of the manufacturer's item and provide proof with their offer. All invoicing must be submitted electronically through the PIEE-WAWF system.