PUMP UNIT. CTFGL
This opportunity is for the manufacture and supply of a PUMP UNIT, with inspection and acceptance required at the source. The contract will be awarded based on Lowest Price Technically Acceptable (LPTA) criteria, and the contractor must be an authorized distributor of the original manufacturer. Performance of work is restricted to the named production facility unless a change is approved by the Contracting Officer. The contractor is responsible for all inspection requirements and must maintain records for 365 days after final delivery. No budget, submission timeline, or performance location is specified.