POWER SUPPLY
SPRMM1-26-Q-KE03
This is a procurement for material where delivery timelines and the offer validity period are to be determined. The performance location is not specified, but any change to the production facility named in the contract requires written approval and must include a $250 price reduction to cover administrative costs. Award will be based on Lowest Price Technically Acceptable (LPTA) criteria. Vendors must specify the OEM and part number if not the manufacturer, and electronic invoicing through PIEE-WAWF will be required.