Inactive
Notice ID:SPRHA1-20-R-1685
Synopsis PR Number(s): FD20201901685 Line Item: 0001 NSN: 1630010870430 VALVE ASSEMBLY,BRAK P/N: 6002051-2, P/N: 16VL014004-3, Description: Helps control braking pressure Supp. Description: F-16 : 0.0...
Synopsis PR Number(s): FD20201901685 Line Item: 0001 NSN: 1630010870430 VALVE ASSEMBLY,BRAK P/N: 6002051-2, P/N: 16VL014004-3, Description: Helps control braking pressure Supp. Description: F-16 : 0.0000 Applicable to: None Destn: FMS COUNTRIES. PR Number(s): FD20201901685 Line Item: 0001AA TEST REPORT IAW DD 1423-1 ATTACHED HERETO Quantity: 1.0000 LO Destn: FMS COUNTRIES. PR Number(s): FD20201901685 Line Item: 0001AB FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE Quantity: 1.0000 EA Destn: FMS COUNTRIES. PR Number(s): FD20201901685 Line Item: 0001AC PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE Quantity: 13.0000 EA Destn: FMS COUNTRIES. PR Number(s): FD20201901685 Line Item: 0001AD PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE Quantity: 14.0000 EA Delivery: 05 APR 2021 On or Before Destn: DPK002,, , - . Quantity: 14.00 Unit of Issue: EA Duration of Contract Period: TBD Electronic procedure will be used for this solicitation. To: MEGGITT AIRCRAFT BRAKING SYSTEMS CO, AKRON, OH.,44306-4188. To: LOCKHEED MARTIN CORPORATION, FORT WORTH, TX.,76108-3619. One or more of the items under this acquisition is subject to Free Trade Agreements. It is suggested that small business firms or others interested in 1 subcontracting opportunities in connection with the described procurement make contact with the firm(s) listed. First article test required. This part required engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. 2