Fan Assembly, Centrifugal
This requirement is for a centrifugal fan assembly (NSN 4140-01-518-9034; MFPN 12438403-2), procured as firm-fixed-price with a base quantity of 24 EA and an option quantity of 24 EA, FOB destination, with performance in CONUS. The option period is 365 days after award, and delivery is 390 days with First Article Test (FAT) or 300 days without FAT. FAT is required but a waiver is available upon request, and higher-level contract quality, pretreatment/CARC painting, and other special clauses apply. Technical data is export-controlled and requires Joint Certification Program (JCP) certification plus a SAM.gov access request. A reverse auction may be used as a pricing technique, and if held, contractors must register in the reverse auction system and complete the required online training.