47--TUBE ASSEMBLY,METAL
SPE7M426U0301
This is a proposed procurement for a metal tube assembly with a one-year contract term or until total orders reach $350,000. The delivery timeline is 93 days after receipt of order. Items will be shipped to various DLA Depots within and outside the continental United States. Quotes must be submitted electronically, and digitized drawings are available online.