47--HOSE ASSEMBLY,NONME
SPE7M426T006D
This is a procurement for 78 units of a specific non-metallic hose assembly. The delivery location is DLA Distribution San Diego, and the required delivery timeline is 126 days after receipt of order. The solicitation is an RFQ available only electronically, with digitized drawings and specifications also available online. Quotes must be submitted electronically for consideration.