17--INSERT,CONTROL VALV
SPE7M226Q0386
This is a procurement for control valve inserts with four separate delivery lines. The first line requires 10 units to be delivered to DLA Distribution San Diego within 313 days after receipt of order. The remaining three lines each require 1 unit, with two lines due in 313 days and one line due in 120 days, all to the same location. The opportunity is open to all responsible sources. Quotes may be submitted electronically.