59--SWITCH,PUSH
SPE7M226Q0283
This is a procurement for push switches, with four separate delivery lines. The first line requires 14 units to be delivered to DLA Distribution San Diego within 945 days. The other three lines each require 1 unit to be delivered to the same location, with two lines due in 945 days and one line due in 45 days. The location for performance is the DLA Distribution San Diego. Quotes may be submitted electronically.