61--CABLE,POWER,ELECTRI
SPE7M126T7343
This is a procurement for 5,500 feet of a specific power cable, which must be manufactured to a source-controlled drawing. The delivery location is DLA Distribution Cherry Point, with a required delivery timeline of 282 days after receipt of order (ARO). Approved sources for this item are listed. Quotes must be submitted electronically and will be considered from all responsible sources.