61--MAGNET WIRE
SPE7M126T5706
This is a procurement for magnet wire, with a quantity of 17 units required. The delivery location is the DLA Distribution Depot Hill, and the required delivery timeline is 0150 days after receipt of order (ARO). The solicitation is an RFQ available only electronically, with digitized drawings and specifications also available online. All responsible sources may submit quotes, which must be done electronically.