Inactive
Notice ID:SPE7LX24RX018
NOTE: SOLICITATION TO BE ISSUED UNDER FAR PART 13.5 UTILIZING COMMERCIAL PROCEDURES. DLA Land & Maritime is preparing to issue solicitation #SPE7LX24RX018 under FAR Part 13.5 Commercial Procedures. Th...
NOTE: SOLICITATION TO BE ISSUED UNDER FAR PART 13.5 UTILIZING COMMERCIAL PROCEDURES. DLA Land & Maritime is preparing to issue solicitation #SPE7LX24RX018 under FAR Part 13.5 Commercial Procedures. The Government intends to award a five-year Indefinite Quantity Contract (IQC). The acquisition will include a population of one National Stock Number (NSN) item. The firm-fixed price five-year LTC will be structured with a 3-year Base and two one-year Option periods. This acquisition is being pursued to provide continued or improved supply availability. This procurement will be solicited as unrestricted. The solicitation will reflect Inspection/Acceptance at Origin, F.O.B. at Origin. The item requires Contractor First Article Testing. The solicitation will be for the procurement of the below NSN: CLIN 0001: NSN 2510-01-303-2933 SHOCK ABSORBER, DIRE INSPECTION AND ACCEPTANCE AT ORIGIN FOB ORIGIN 1G IAW BASIC DRAWING NR 19207 12361491 REVISION NR D DTD 04/25/1994 PART PIECE NUMBER: IAW REFERENCE QAP 19207 12361491 REVISION NR A DTD 12/31/1996 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12361791 REVISION NR C DTD 06/30/1992 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12369003 REVISION NR H DTD 09/24/2018 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12361491 REVISION NR DTD 02/28/2019 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12361491 REVISION NR A DTD 03/14/2002 PART PIECE NUMBER: The RFQ will be available at the DLA Internet Bid Board System (DIBBS) website at http://www.dibbs.bsm.dla.mil/rfp on or about December 18th, 2023. NOTE: Due to system constraints, it may take as long as three business days from the stated date for the solicitation to post to DIBBS. Hard copies of the solicitation will not be available. While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, past performance and offered delivery and potentially other factors. An award may be made to other than the lowest-priced, technically-acceptable, responsible offeror(s).