16--RACK,ACTUATION MECH
SPE4A726T7501
This is a procurement for eight actuation mechanism racks, which are source-controlled items that must meet specific drawing requirements. The delivery location is DLA Distribution San JoaquĆn, and the required delivery timeline is 144 days after receipt of order (ARO). Approved sources for this item are listed. Quotes must be submitted electronically, and digitized drawings are available online.