Electrical Brush
This is a long-term contract for electrical carbon products with a two-year base period. The production delivery timeline is 155 days after receipt of order (ARO), and stock shipments will occur within the continental United States. The estimated annual demand for the base period is 10,669 units, with a guaranteed minimum quantity of 5,334 units. The solicitation is unrestricted and will be available for download online in PDF format, with no paper copies offered.