3 Phase Power Supply Test System
This opportunity requires the contractor to provide two new, non-refurbished power supply test systems (18kVA and 1kVA) to the Defense Supply Center Columbus in Ohio. The systems must meet specific technical specifications, including DC to 5kHz operation, 0.15% accuracy, and NIST-traceable calibration. Delivery is required within 30 days from the date of award, with all shipping costs included in the contract price. The contractor must also supply two Windows 11 PCs with software, interfaces, and provide 8 hours of on-site training and setup. An optional extended warranty and multi-year service contract must be offered.