Electric Power Resiliency Building 56
This commercial products/services requirement is for work at Defense Distribution San Joaquin, California. The contractor will provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system, including a 500 kW AC roof-mounted solar photovoltaic system for Building 56. The PV hardware and services must meet or exceed all local, state, and utility requirements, applicable codes and standards, and listing/qualification tests, with design and installation complying with the most recent documents. The contractor is responsible for the final on-site PV design based on site conditions, roofing materials, and selected components, and the system must adhere to California Building Codes, the California Solar Initiative, and CEC technical/installation specifications. Building 56 is fed by one existing electric substation with a 12,470/408V, 3,000 kVA transformer and switchgear rated at 4,000A bus bar with four existing 1,200A frame-size circuit breaker spaces available.