Inactive
Notice ID:SC06002101361
The Contractor shall pump fuel/water mixture originating from the base Bulk Fuels Storage area at Seymour Johnson AFB. It is estimated that the base will require about 12,000 gallons of fuel/water mix...
The Contractor shall pump fuel/water mixture originating from the base Bulk Fuels Storage area at Seymour Johnson AFB. It is estimated that the base will require about 12,000 gallons of fuel/water mixture to be removed.