Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:PANSWD24P0000004325
The scope of the contract is such that the Contractor shall provide all labor, materials, and equipment necessary to perform site preparation construction services. Services required shall include, bu...
The scope of the contract is such that the Contractor shall provide all labor, materials, and equipment necessary to perform site preparation construction services. Services required shall include, but are not limited to; erosion, sediment, and pollution control; construction surveys; removal of water; site investigation; aggregate course; erosion control measures; earth fill; hauling; seeding; install poured in-place concrete; felling and bunching of standing timber; deep harrowing; geotextiles; excavation; riprap; clearing and grub; heavy mowing; smoothing; silt fence, type A,; reinforced concrete culvert pipe and appurtenances; diversions and ditch cutouts; corrugated culverts.