Foster Spillway Gate Nut Replacement and Re-Tensioning

Notice ID:PANNWD-26-P-0000033137

The work involves replacing custom castle nuts, U-bolts, spacers, gate connection pins, and an installation tool made from specified materials, followed by tensioning gate wire ropes to ensure even gate travel and ogee contact. The contractor must handle release and re-tensioning of wire ropes during preparation and finishing activities. The USACE Portland District intends to advertise in November 2026 and award in December 2026, with the contractor proposing a work schedule. The estimated construction cost is between $1,000,000 and $5,000,000. A firm-fixed-price contract is anticipated, with maximum small business participation sought and CMMC Level 2 (Self) certification required.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2KA REPAIR OR ALTERATION OF DAMS
LOCATION: Not Given
Primary Contact
Chris Burroughs
Not Given
Alt Contact
Justin F Figueredo
503-***-4628


Data sourced from SAM.gov. View Official Posting »