Inactive
Notice ID:NAVMWR-23-Q-0050
This project consists of 2 locations, the CDC playground and the SAC playground. The contractor shall provide all services, including materials, labor, and installation required remove existing bonded...
This project consists of 2 locations, the CDC playground and the SAC playground. The contractor shall provide all services, including materials, labor, and installation required remove existing bonded rubber surface and furnish and install aggregate subgrade and PIP Surfacing at the CDC playground; at the SAC playground, remove worn areas of PIP Surfacing and furnish and install new PIP Surfacing. The contractor shall provide installation services in accordance with the manufacturer’s specifications and in accordance with the publications listed in Section C of the attached RFQ. See attached RFQ for details and submittal requirements.