Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:N6893623Q0254
The purpose of this amendment is to include 52.252-3 in section L posting of questions and answers received regarding hangar light replacements. Closing date and time of 10/10/2023 at 4:00 PM PST rema...
The purpose of this amendment is to include 52.252-3 in section L posting of questions and answers received regarding hangar light replacements. Closing date and time of 10/10/2023 at 4:00 PM PST remains unchanged. Submit quotes via email to Beth Exzabe at Beth.a.exzabe.civ@us.navy.mil. 1 . What is the height from finished floor to highest point in Hangar? Answer: The height from floor to the interior hangar ceiling 28’01”. 2. Is the hangar clear of obstacles or is Contractor to put into price, moving of objects to get lifts in to complete work? Answer: The hangar is occupied with jets and drones. The government representatives (Rodney and Nick) will work with the tenants to move equipment around the work area and man-lift during this construction. 3. What size wire is currently feeding Lighting panel “LPA”? Answer: The actual wire size from the main switchboard to panel LP is unknown. However, it is 225A panel so it should be 4#4/0 under 75C. 4. It states that the Site Safety and Health Officer may also serve as the Site Superintendent. It than states that the Quality Control can be a “Roving Project Manager” Does this mean that the SSHO and Superintendent are one hat and to be on-site at ALL times and the QCM does NOT have to be on-site at all times but as needed? This would mean the contractor is to put one hat into proposal? Answer:The Part 2a required a full time Superintendent and a part time (roving) QC manager. So just a superintendent will not meet the requirements of Part 2a. The QC position (second Hat) will need to be proposed, but it will not need be a full time position.