Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:N6883621Q0353
Dispose of five (5) Port Operations Paint Floats. Paint Floats are obsolete and beyond economical repair and require disassembly. Period of Performance (POP) shall be removal from basin within 2 weeks...
Dispose of five (5) Port Operations Paint Floats. Paint Floats are obsolete and beyond economical repair and require disassembly. Period of Performance (POP) shall be removal from basin within 2 weeks after contract award and completion of disassembly and scrapping within 2 months after contract award.