Crash Crane Radiator Test & Evaluation
This contract requires the contractor to inspect, teardown, remanufacture, and potentially repair up to three Radiators (part # 5101908) to Original Equipment Manufacturer standards. All work will be performed at the contractor’s facility, with the government shipping the units to the contractor. The contractor must provide a capability statement, test and evaluation quotes, and repair quotes for each radiator. If the repair option is exercised, delivery is required before 31 December 2026. The Test & Evaluation phase must be completed by 28 September 2026.