Wideband Satcom AAU Lifting Adapter
The U.S. Navy PMA 290 has a Total Small Business Set-Aside requirement for build-to-print manufacturing of the Wideband Satcom AAU Lifting Adapter, P/N 4091AS0125-1, and offerors should price 15 total units across CLINs 0001-0004. Drawings are Government-owned and export controlled; offerors must provide a certified DD Form 2345, Level 2 CMMC certification, and request the current drawing package through their designated data custodian. The prime contractor itself must have and maintain an ISO 9001-compliant production QA system, even if a qualified subcontract manufacturer performs the build-to-print fabrication. CLIN 0001 delivery is shown as an estimated 31 December 2026, subject to a quoted lead time. All non-successful offerors must destroy all export-control data and provide a signed corporate letter as proof of destruction to the PCO.