Inactive
Notice ID:N6339426Q4005
Sources Sought Only Drawings are available upon request and approval. Fabricate a Control Console to include interfaces to perform the following: o Detect and indicate PIN-to-SOCKET proper alignment (...
Sources Sought Only Drawings are available upon request and approval. Fabricate a Control Console to include interfaces to perform the following: o Detect and indicate PIN-to-SOCKET proper alignment (performed by CR Adapter’s Photo Sensors). This can be accomplished by using green/red LIGHTS for a go/no-go condition, respectively. o Engage/disengage SOCKETS and PINS (performed by the CR Adapter’s pneumatic actuators). This can be accomplished by using green/red PUSH-BUTTONS for a go/no-go condition, respectively. The actuators’ limit switches need to be monitored during extend/retract operations. Provide support during the onsite installation at Missile-Intermediate Level Maintenance Facility (M-ILMF) to monitor the following: o Connection of the Control Console to the facility-provided Electrical Power Receptacle, including connections to the Power Supply, Photo Sensors, Limit Switches and Pneumatic Actuators’ Solenoid Valves o Connection of the Pneumatic Actuators to the facility-provided Compressed Air Drop o Ensure satisfactory performance of the completed Control System after installation