MCM-14 RAISED WATERTIGHT HATCH ASSEMBLY 1-92-2 REPLACE, RAISED WATERTIGHT HATCH ASSEMBLY 01-6-1 REPLACE, STRIKER PLATE ON WTQA 1-86-1 REPLACE, JOINER DOOR 1-82-1 REPLACE, RIM LATCH ASSEMBLY IN 02-35-2 REPLACE

Notice ID:N6264926Q0427

The work is to be performed in Sasebo, Japan, and is restricted to sources authorized to operate in Japan under DFARS 225.1103 (3) and 252.225-7042. Only contractors with an active Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) in Japan, or those agreeing to execute one before award, are eligible. The scope includes replacing raised watertight hatch assemblies, a striker plate, a joiner door, and a rim latch assembly on the USS CHIEF (MCM-14). No budget amounts or submission timelines are specified in the description. Contractors outside Japan that cannot demonstrate compliance with DFARS 252.225-7042 will not be considered.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP FLT LOG CTR YOKOSUKA
  PSC   J999 NON-NUCLEAR SHIP REPAIR (WEST)
LOCATION: Not Given
Primary Contact
Masako Matsueda
095-***-2854

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »