Inactive
Notice ID:N6247317D3809X121
This is a DDC project to upgrade the current Barber Colman DDC Microzone controllers 15-17 & 20-21 to the new MP-C controllers compatible with the existing Automation Server at NAS Fallon. All materia...
This is a DDC project to upgrade the current Barber Colman DDC Microzone controllers 15-17 & 20-21 to the new MP-C controllers compatible with the existing Automation Server at NAS Fallon. All materials and labor shall include the necessary activities items that results in the existing equipment attached to these controllers operating with the new EcoStruxure protocol. All current sequence of operations (SOO) shall be maintained with the new upgrade. The DDC shall connect to the EcoStruxure workstation. All to design a programming scheme for the new EcoStruxure platform that matches the current SOO related to each of the above mentioned facilities. It shall also include security measures. Replacing Microzone controllers #15-17 & 20-21 with new Schneider Electric MP-C controllers and provide programming and graphics interface accordingly at the local server level as well as in where the head end workstation is located. Verify operability of both.