Inactive
Notice ID:N61331-22-T-NS14
AMENDMENT #3 EXTEND THE CLOSING DATE TO 9/14/2022 AMENDMENT #2 REMOVE SET-ASIDE AND EXTEND THE CLOSING DATE TO 9/2/2022 AMENDMENT #1 CHANGES DRAWINGS FROM PUBLIC TO CONTROLLED Email quotes to adrienne...
AMENDMENT #3 EXTEND THE CLOSING DATE TO 9/14/2022 AMENDMENT #2 REMOVE SET-ASIDE AND EXTEND THE CLOSING DATE TO 9/2/2022 AMENDMENT #1 CHANGES DRAWINGS FROM PUBLIC TO CONTROLLED Email quotes to adrienne.f.brooks.civ@us.navy.mil on or before the closing date and time of Wednesday 14 September 2022 4pm Central Time. The Government will not accept late quotes. Provide CAGE code and Lead time on your quote. Be able to invoice through Wide Area Workflow (WAWF). If shipping is not included in the price, please include a line item for shipping. The Government intends to award a firm fixed price purchase order using simplified acquisition procedures. Destination: Naval Base Kitsap-Keyport, Washington.Please review all attachments. A description of the supplies or services required to meet the agency’s needs. Scope: This proposed contract is for procurement of Spacer, End of Run System, NAVSEA Drawing 2820825 Rev A, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. The award shall be for a base year with one option year. Requirements: CLIN 0001- Spacer, End of Run System First Article (Qty. 2) The contractor shall build Spacer, End of Run System FAs in accordance with NAVSEA Drawing 2820825 Rev A, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance. CLIN 0002- Spacer, End of Run System Production (Qty. 18) The contractor shall build Spacer, End of Run System Production Lot in accordance with NAVSEA Drawing 2820825 Rev A, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance. CLIN 0003- Spacer, End of Run System Production - Option 1 (Qty. 10)