Inactive
Notice ID:N61331-22-T-NS12
AMENDMENT #5 REMOVE SET-ASIDE AND EXTEND THE CLOSING DATE TO 9/7/2022 AMENDMENT #4 ONE ADDITIONAL DRAWING UPLOADED AMENDMENT #3 ONE ADDITIONAL DRAWING UPLOADED AMENDMENT #2 TWO ADDITIONAL DRAWINGS UPL...
AMENDMENT #5 REMOVE SET-ASIDE AND EXTEND THE CLOSING DATE TO 9/7/2022 AMENDMENT #4 ONE ADDITIONAL DRAWING UPLOADED AMENDMENT #3 ONE ADDITIONAL DRAWING UPLOADED AMENDMENT #2 TWO ADDITIONAL DRAWINGS UPLOADED AMENDMENT #1 CHANGES DRAWINGS FROM PUBLIC TO CONTROLLED Email quotes to adrienne.f.brooks.civ@us.navy.mil on or before the closing date and time of Wednesday 7 September 2022 4pm Central Time. The Government will not accept late quotes. Provide CAGE code and Lead time on your quote. Be able to invoice through Wide Area Workflow (WAWF). If shipping is not included in the price, please include a line item for shipping. The Government intends to award a firm fixed price purchase order using simplified acquisition procedures. Destination: Naval Base Kitsap-Keyport, Washington. Please review all attachments. A description of the supplies or services required to meet the agency’s needs: Scope: This proposed contract is for procurement of Socket Connector Assembly, NAVSEA Drawing 2819417-3 Rev E, and NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference, Sequential, and all associated drawings, changes, and specifications. The award shall be for a base year with one option year. Requirements: CLIN 0001 – Socket Connector Assembly First Article (Qty. 2) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2819417-3 Rev E, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance. CLIN 0002 - Socket Connector Assembly Production (Qty. 48) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2819417-3 Rev E, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance. CLIN 0003 – Socket Connector Assembly First Article (Qty. 2) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference – Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance. CLIN 0004 – Socket Connector Assembly Production (Qty. 48) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference – Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance. CLIN 0005 – Socket Connector Assembly Option 1 (Qty. 30) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2819417-3 Rev E, Baseline with Drawing Reference – Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance. CLIN 0006 – Socket Connector Assembly Option 1 (Qty. 30) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference – Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU – End user inspection and acceptance.