Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:N4425522RA559
The Contractor shall provide labor and equipment, as required, to accomplish the following work in accordance with the statements herein: Provide H2S Treatment chemical supply, system monitoring, and ...
The Contractor shall provide labor and equipment, as required, to accomplish the following work in accordance with the statements herein: Provide H2S Treatment chemical supply, system monitoring, and maintenance services at three sewage lift stations on NBK Bangor for a one-year duration, plus one option year. Escorts are required for access to the Waterfront Restricted Area (WRA). All work must be coordinated through the NAVFAC Engineering Technician (ET). A preconstruction meeting shall be coordinated at least two (2) weeks prior to start of work and include at a minimum the ET, Customer, Contractor, and all required Sub-Contractors.