Temp Chiller Rental
This is a solicitation for a heavy-duty, air-cooled chiller unit with a minimum capacity of 150 tons. The unit must be a critical system capable of 24/7 operation, delivering 450 GPM at 300 feet of head pressure, with specific electrical, connection, and construction requirements. The contractor is responsible for providing a complete system from the return manifold to the supply manifold, including all necessary pumps, piping, valves, and insulation. The unit must have specific monitoring capabilities and be delivered with operational manuals, training, and clear identification tags.