USS LEWIS B PULLER -MTA -FY 27.
N4033926RF508PSL
MSC requires a Mid-Term Availability (MTA) package for the USS LEWIS L PULLER. The package includes ninety (120) work items, one optional work item, and seven not separately priced (NSP) work items, with pier-side docking required at the contractor’s facility. Technical drawings and specifications will be provided upon request after solicitation issuance. Performance will take place at the contractor’s facility within the Seventh Fleet AOR. The anticipated Period of Performance is 1 June through 16 July 2027.