USS LEWIS B PULLER -MTA -FY 27.

Notice ID:N4033926RF508PSL

MSC requires a Mid-Term Availability (MTA) package for the USS LEWIS L PULLER. The package includes ninety (120) work items, one optional work item, and seven not separately priced (NSP) work items, with pier-side docking required at the contractor’s facility. Technical drawings and specifications will be provided upon request after solicitation issuance. Performance will take place at the contractor’s facility within the Seventh Fleet AOR. The anticipated Period of Performance is 1 June through 16 July 2027.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP FLC BAHRAIN
  PSC   J998 NON-NUCLEAR SHIP REPAIR (EAST)
LOCATION: Not Given
Primary Contact
Prince Joseph
17****15
Alt Contact
Lisbon Dennis
318-***-6134

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »