RR24-RR44 Sidewalk Repairs and MCASNR MTI Reflector Towers Concrete Pads
N4008526R9076
The project involves removing and replacing damaged sidewalk portions at Powder Lane on Stone Bay, Camp Lejeune, NC, and pouring four new concrete slabs at MTI Reflector Towers on the flightline at New River, NC. Each slab will be 4 inches thick, measuring 20 by 22.5 feet, placed over crushed rock, with two PVC conduits built in and extending 5 feet beyond the slab edge. Three sites require minimal leveling work, while one site needs a retaining wall and dirt infill to create a level slab. Repair of any damaged grass or road from construction is also included.