P993/995, F-35 Aircraft Sustainment Center and Composite Repair Facility located at the Marine Corps Air Station (MCAS) Cherry Point, NC
The F35 Sustainment Center project involves constructing a 255,461 SF depot-level hangar for 20 F-35 aircraft, including paint booths, administrative space, and a secure area, along with a 105,755 SF Composite Repair Facility. The main hangar features a precast concrete panel structure with a cross-laminated timber roof deck, while site development includes utility improvements, a taxiway with a bridge, and an aircraft parking apron. The Composite Repair Facility includes a composite repair and manufacturing shop and an aircraft rotor blade repair shop, with shared spaces to reduce costs. Two offerors, ECC Atlantic Construction and Walsh Federal, have been pre-qualified for Segment II. No budget amounts, submission timelines, or performance location are specified in the description.