Amendment
N4008525R0098
This requirement is for the replacement of a failed pad-mount transformer and its associated air switch, and the installation of a manual transfer switch with a generator docking station to improve emergency power connectivity for two specified buildings. The work is set aside for 8(a) contractors under the MACC program. Performance of the services is to occur primarily within the NAVFAC Mid-Atlantic Hampton Roads Area of Responsibility in Virginia. No specific budget or project timelines are detailed in this description.