Total Small Business Set-Aside (FAR 19.5)
Notice ID:N4008525B2501
Base Bid Scope: a. Constructing laydown area to store materials and equipment. b. Providing payment to regulating authorites for In-Lieu Fee. c. Raising and widening of exisitng gravel road at work Ar...
Base Bid Scope: a. Constructing laydown area to store materials and equipment. b. Providing payment to regulating authorites for In-Lieu Fee. c. Raising and widening of exisitng gravel road at work Area G. Constructing stone revetment slope on ocean side of roadway. The revetment construction will require portions of the Ground Grid to be temporarily cut such that additional length can be added and the grounding wire be lowered in the ground prior to installation of revetment. The grounding wire is to be repaired via exothermic weld. See Specification 01 14 00.00 20 Attachment A for grounding grid work requirements.Installation of several drainage features including a new open bottom box culvert. The open bottom box culvert requires the final design to be provided by the manufacturer. d. Raising and widening of exisitng gravel road at work Area H. Constructing stone revetment slope on ocean side of roadway. The revetment construction will require portions of the Ground Grid to be temporarily cut such that additional length can be added and the grounding wire be lowered in the ground prior to installation of revetment. The grounding wire is to be repaired via exothermic weld. See Specification 01 14 00.00 20 Attachment A for grounding grid work requirements. Installation of several drainage features including a new open bottom box culvert. The open bottom box culvert requires the final design to be provided by the manufacturer. e. Incidental related work. Option Work: Option 1: Roadway safety improvements at Vicker's corner. Improvements include: regrading the roadway, new pavement, guardrail, striping, signage as well as other incidental related work. Option 2: The removal and replacement of two (2) existing roadway culverts on ridge road. Mill and overlay of approximately 2,800 lf of roadway between B103 and B100. Provide crack seal after mill prior to overlay. Work must be sequenced such that the culverts are replaced prior to the mill and overlay. Option 3: 2,000 Tons of pavement to be placed along contiguous sections of roadway along the perimeter security roads.