The project w ill repair project replaces 77 year old 50,000 gpm (gallons per minute) river w ater cooling system w ith new 8,200 gpm cooling tower with capability to reject heat up to 75 MMBH (Millio...
The project w ill repair project replaces 77 year old 50,000 gpm (gallons per minute) river w ater cooling system w ith new 8,200 gpm cooling tower with capability to reject heat up to 75 MMBH (Million British Thermal Units per Hour). Adequate cooling water system w ith capacity to cool up to 8,200 gallons of water per minute w ith heat rejection of up to 75 MMBH. Cooling water is required to support RDT&E mission performed in the Building 633 Complex, including test and evaluation (T&E) of Columbia Class Program Integrated Power System. The cooling water system needs to provide a reliable source of cooling water on demand, whenever required to support testing, w hile minimizing environmental impacts.