The work includes the repair of Load Center 2 and incidental related work. Repairs within Load Center 2 include the following: removal and replacement of the two 13.8kV primary/ 480V secondary 2000kVA...
The work includes the repair of Load Center 2 and incidental related work. Repairs within Load Center 2 include the following: removal and replacement of the two 13.8kV primary/ 480V secondary 2000kVA transformers, 3000A 480V switchboard, interior lighting, and interior electrical low-voltage distribution equipment and branch circuit wiring. Scope within Load Center 2 also includes demolition of interior walls to allow for removal of electrical equipment, and repair of the existing utility cable vaults. In addition, scope includes demolition and replacement of two existing ship-to-shore power connection stations and associated under-pier 480V power and control wiring to the Load Center 2 480V switchgear and incidental related work.