Inactive
8(a) Set-Aside (FAR 19.8)
Notice ID:N40085-22-R-2545
The project consists of the full replacement of the existing sloped metal roof at Building (Hangar) 23, NASO. The work includes, but is not limited to, the removal of the existing metal roof in its en...
The project consists of the full replacement of the existing sloped metal roof at Building (Hangar) 23, NASO. The work includes, but is not limited to, the removal of the existing metal roof in its entirety, removal of roof insulation in its entirety, installation of new aluminum metal roof panels, associated flashings, gutters and downspouts, and new roof insulation. Structural work is required in support of the roof replacement and installation of permanent fall protection and snow guards. Electrical work is required to install a new lightning protection system.The project consists of the full replacement of the existing sloped metal roof at Building (Hangar) 23, NASO. The work includes, but is not limited to, the removal of the existing metal roof in its entirety, removal of roof insulation in its entirety, installation of new aluminum metal roof panels, associated flashings, gutters and downspouts, and new roof insulation. Structural work is required in support of the roof replacement and installation of permanent fall protection and snow guards. Electrical work is required to install a new lightning protection system.The project consists of the full replacement of the existing sloped metal roof at Building (Hangar) 23, NASO. The work includes, but is not limited to, the removal of the existing metal roof in its entirety, removal of roof insulation in its entirety, installation of new aluminum metal roof panels, associated flashings, gutters and downspouts, and new roof insulation. Structural work is required in support of the roof replacement and installation of permanent fall protection and snow guards. Electrical work is required to install a new lightning protection system.