Inactive
8(a) Set-Aside (FAR 19.8)
Notice ID:N40085-21-R-0189
This project includes the removal of the existing chiller, providing a new chiller, connection to existing underground chilled water piping, testing and balancing chilled water loop system and all inc...
This project includes the removal of the existing chiller, providing a new chiller, connection to existing underground chilled water piping, testing and balancing chilled water loop system and all incidental related work. Work to be done at Building 100, Lafayette River Annex, Norfolk VA.