N40084 BUILDING 90 DEMOLITION AT COMBINED ARMS TRAINING CENTER, CAMP FUJI, JAPAN
The contractor is responsible for all labor, equipment, and materials needed to fully demolish, remove, and dispose of a building, including its structures, systems, and surrounding paved surfaces. The scope covers interior and exterior finishes, roofing, foundation, structural components, tanks, and pipelines. It also includes all building systems such as HVAC, fire protection, boilers, electrical, and plumbing. Additional items to be removed are signs, sheds, drainage ditches, sidewalks, and road surfaces. No specific timelines, budget amounts, or location for performance were provided in the description.