Inactive
Notice ID:N4008423T0402
a. Replace windings of a motor and a generator. b. Replace 50Hz 6.6kV and 60Hz 13.8kV cables from/to 2F Switchgear Room. c. Remove existing devices and accessories; and provide new ones as required. d...
a. Replace windings of a motor and a generator. b. Replace 50Hz 6.6kV and 60Hz 13.8kV cables from/to 2F Switchgear Room. c. Remove existing devices and accessories; and provide new ones as required. d. Modify existing bearings to increase their cooling capacities. e. Remove existing wirings/cables off existing Frequency Convertor (FC) #6 and SCADA Main Terminal Board [OEM: TOSHIBA] for the Power system on the 2ndfloor that are physically connected to existing Motor, Korndorfer, Generator, Motor Control, Generator Control, and Neutral-Ground-Resistance Switching Panel boards for FC#6 on the 1st floor at Bldg#1805 f. Provide and install new Motor, Korndorfer, Generator, Motor Control, Generator Control, and Neutral-Ground-Resistance Switching Panel boards for FC#6 on the 1st floor at Bldg#1805. g. Provide/install new wirings/cables/conduits to reconnect to the new control panel board to the existing FC#6 and the existing Main Terminal Board for the Power in the SCADA server room on the 2nd floor to functionally operate as it is. h. Provide all functional testing for the FC system.