REPLACE EXISTING DETERIORATED HANDRAILS WITH ALUMINUM HANDRAILS THROUGHOUT BASE AT CFA CHINHAE, KOREA
N40084-24-Q-4010
The work includes replacement of deteriorated handrails described on plans and specifications. The work shall be completed within 180 calendar days after award.