Inactive
8(a) Set-Aside (FAR 19.8)
Notice ID:N4008022R0259
*** This Solicitation is reserved exclusively for the vendors of the $750M 8 (a) MACC (Multiple Award Construction Contract ) managed out of NAVFAC Washington.*** H115 to saw cut concrete and asphalt....
*** This Solicitation is reserved exclusively for the vendors of the $750M 8 (a) MACC (Multiple Award Construction Contract ) managed out of NAVFAC Washington.*** H115 to saw cut concrete and asphalt. Demo and properly dispose of concrete, rebar, joint control material and asphalt. Scarify and excavate existing base material, fill and compact. Install rebar, concrete, asphalt and control joint material and sealant for the apron at H115. H2805 to saw cut concrete. Demo and properly dispose of concrete, rebar and control joint material. Clean demoed concrete areas. Scarify and excavate existing base material, fill and compact. Install control joints, rebar, concrete and control joint sealant. Clean existing asphalt and fog seal H2805.